|
||||
|
19.11 Continued group work
Page last edited by Per Bækgaard (pgba) 17/11-2019
Monday November 18th
Learning objectives week 11Assignment week 11Continue working on your project, using the methods you have learned throughout the course: Iterate your project idea, each time validating with other groups or - better - with prospective users. Make sure you capture and document all artefacts and summarise findings and what you did, for each iteration (these may need to go into your report as appendices or summarised in the main text). For each iteration, you need to create/revise your a 1) landing pages, 2) lean canvas, 3) user story map and 4) annotated wireframes (with micro- and backend interactions) as well as 5) your executable (e.g. Marvel) prototype. In addition, 6) document what you have validated and how you did that. Make sure you validate all elements of your idea, and not only your wireframes, through the iterations, so that your final iteration at the end of week 13 can be considered a MVP candidate.
Upload a short presentation based on the latest iteration of your project idea (artefacts 1, 2, 3, 4, 5 and 6) to CampusNet by Saturday 19:00; include (when possible) the full set of artefacts. There is NO peergrade week 11. Instead you need to practice pitching your idea and solution based on the presentation you hand in, so that you're ready to pitch it the following monday to other groups. Make sure you can do your presentation in 3 minutes (or less) -- this usually takes some practice.
|
|||