|
|||||||
|
19.12 Peer-group review
Page last edited by Per Bækgaard (pgba) 24/11-2019
Monday November 25th
Morning sessions Slides for the morning sessions.
Peer group feedback After the common morning session in 208, we will go back to building 324 and split into peer-groups (2 or in a few cases 3 groups together). In the peer groups, do as follow:
The following peer-groups meet in 324#020:
The following peer-groups meet in 324#040:
The following peer-groups meet in 324#060:
Once groups have found one another, feel free to move to areas also outside the room. Assignment week 12 Continue working on your project, using the methods you have learned throughout the course, taking into account the feedback you receive from this weeks presentation and discussion. Also start to write your final report, if you haven't already (see Week 13 for details on the format etc). Iterate your project idea, each time validating with other groups or - better - with prospective users. Make sure you capture and document all artefacts and summarise findings and what you did, for each iteration (these may need to go into your report as appendices or summarised in the main text). For each iteration, you need to create/revise your a 1) landing pages, 2) lean canvas, 3) user story map and 4) annotated wireframes (with micro- and backend interactions) as well as 5) your executable (e.g. Marvel) prototype. In addition, 6) document what you have validated and how you did that. Make sure you validate all elements of your idea, and not only your wireframes, through the iterations, so that your final iteration at the end of week 13 can be considered a MVP candidate. Upload a revised 3-minute presentation that you will use for the final presentation. This should be based on the latest iteration of your project idea. You may consider including slides with wireframes/screenshots in your 3-minute presentation that show a typical flow through your system -- but please leave out login details etc. Upload to CampusNet by Saturday 19:00. Include (when possible) the full set of artefacts (1-6 above) as appendices. There is NO peergrade week 12. You may stillneed to practice pitching your idea and solution based on the presentation you hand in, so that you're ready to pitch it the following monday to all other group. Make sure you can do your presentation in 3 minutes (or less) -- this usually takes some practice. However, you will be allowed to spend 2 more minutes on showing a typical flow of using your system, if you include screenshots/wireframes in your pdf file. |
||||||